Sunday, 14 May 2017

Week 72-73 - 2nd Fix and Decoration of Bottom Floors

I started this stage of finishing off the main downstairs workshop full of excitement that we were painting – mainly because it meant for the first time we were doing a final finish somewhere in the building. We’re nearly two years into this project now, so a sentence that contains the words ‘final’ and ‘finish’ seem very appealing. However over 100 litres of paint later I remember: I HATE PAINTING!!! 

Lets start with some before and after pictures to make me feel better…


It has turned out very well and proven itself to be the space i always thought it could be, I am very pleased with the space and level of natural light etc. Now I can move all my tools and machinery (toys) in and we can really start calling it a workshop

 (above)View with back towards front by-fold doors, new staircase is now enclosed to give a clean, quite entrance to gallery above


View towards Byford doors, now also has a separate bike storage area


View from spray shop area into lower workshop 


View from river up the workshop towards the main doors


Canopy with integrated lighting over were main work bench will be


View of utility cupboard for main workshop ready for fuse box install




Me looking thrilled to be painting the floor – mardy!


No comments:

Post a Comment